Commercial Tenant Improvement Drafting Services
Commercial TI plans and permit-ready AutoCAD construction documents for tenant improvement buildouts, retail-to-office and warehouse-to-office conversions, change-of-occupancy projects, and interior remodels, with space planning, building code compliance, and ADA coordination built into the set from day one. Serving Arizona, Southern California, and Nevada.
A commercial tenant improvement lives or dies at plan review. The finishes, the furniture, the branding: none of it matters until the building department approves a drawing set that clearly shows what exists, what is proposed, and how the space complies with code for its use. That drawing set is what REH Drafting & Design produces: complete, code-referenced, permit-ready AutoCAD construction documents, backed by more than 25 years of experience in AutoCAD drafting and design and project management.
What Is a Commercial Tenant Improvement?
A commercial tenant improvement (TI) is the interior buildout or remodel of a commercial space to fit a specific tenant's use: new walls, ceilings, restrooms, and finishes, plus the mechanical, electrical, and plumbing changes that go with them. A TI can be as simple as reconfiguring offices within an existing suite, or as involved as converting a warehouse shell into offices, which triggers a change of occupancy under the building code.
Nearly all of it requires a building permit, and the permit is issued based on the construction drawings. A clean, complete set moves through review; an incomplete one gets bounced, and every bounce costs weeks. That is why the drafting is not a commodity line item. It is the document every plan reviewer, contractor, and inspector on your project reads.
What's Included in a Permit-Ready TI Drawing Set
Every project is scoped to what the jurisdiction actually requires, but a representative REH tenant improvement set includes:
- Title sheet with code analysis: occupancy classification, occupant load, egress summary, and applicable codes, so the reviewer's first questions are answered on sheet one
- Existing conditions and demolition plans: clearly separating what stays from what goes
- Proposed floor plans: dimensioned partition layouts, door and hardware schedules, wall types
- Reflected ceiling plans: ceiling grid, lighting layout, and exit signage
- Power, data, and finish plans coordinated with the tenant's operational needs
- ADA compliance drawings and accessibility details: accessible route, restroom clearances, door approach, and signage
- Coordination sheets for the mechanical, electrical, plumbing, and structural work documented by your licensed consultants
We also provide space planning ahead of the construction set: test fits and layout studies that get the landlord, tenant, and code requirements aligned before money is spent on documentation.
Tenant Improvement Projects We Draft
- Office buildouts and remodels: new suites in shell buildings, reconfigurations of occupied space, and multi-tenant corridor work
- Retail and restaurant buildouts: including full shell-plus-TI packages like our completed 5,005 SF restaurant building in Santa Ana
- Retail-to-office and warehouse-to-office conversions: the change-of-occupancy projects where early code analysis matters most
- Interior remodels of commercial space: restroom upgrades, accessibility improvements, and reconfigured layouts
- Warehouse and industrial spaces: office build-ins and support-space buildouts within warehouse and industrial shells, documented with the code analysis their occupancy requires
If your project involves a change of use, start with our guide to what permits a warehouse-to-office conversion requires. It walks through the occupancy-group mechanics that drive cost and schedule.
How the Process Works
Why the Drawing Set Determines Your Permit Timeline
Most TI schedule blowouts trace back to the same causes: an occupant load miscalculated, accessibility caught at plan review, missing fire separation between uses, or a set that never clearly showed existing versus proposed conditions. These are documentation problems, and they are cheapest to fix before submittal.
Because REH combines drafting with project management, the code analysis, consultant coordination, and jurisdiction requirements are handled as one workflow rather than passed between parties. That workflow includes plan check support from first submittal through approval: reviewer comments answered, revisions turned around, and the permit kept moving. That is the practical difference between a set that circulates for months and one that anticipates the reviewer's questions.
The cheapest place to catch a code problem is in the drawing set — before demo, before submittal, before the reviewer finds it for you.
Featured Tenant Improvement Work
See more completed residential and commercial work on our projects page.
Where We Work
REH Drafting & Design is based in Phoenix, Arizona and provides commercial tenant improvement drafting across three states:
- Arizona: Phoenix, Buckeye, Goodyear, Avondale, Surprise, Peoria, Glendale, and greater Maricopa County
- Southern California: Orange County and Riverside County
- Nevada: Las Vegas and Clark County
Drafting deliverables are digital, so we regularly coordinate with owners, contractors, and consultants across all three states, and can accommodate projects beyond them.
Commercial Tenant Improvement FAQ
What is a commercial tenant improvement (TI)?
Do I need a permit for a tenant improvement?
What drawings are required for a tenant improvement permit?
What is a change of occupancy and why does it matter?
Do you provide stamped architectural or engineering drawings?
Related reading
- Converting a Warehouse to Office Space: What Permits Do You Need?: the change-of-occupancy mechanics behind the most demanding TI projects.
- What Does a Residential Drafter Actually Do?: what you're paying for when you hire a drafter, and why it shows up at plan review.